New Windows and more at 395 Carroll St. |
|
New windows arrived today and some of them were installed on the front of the house. We are really excited by the change in look already. Rep lacing the front door, trim work, painting, lighting and landscaping are still to be done to complete the front, but we've attached a picture so that you can see the style of the windows. Inside, the furnace showed up today and was installed. Work continued on installing the new ducting for the HVAC system. Wiring for the front bedroom was completed and the kitchen speaker system was wired as well. The gas line for the kitchen was finished up and the run to the new fireplace is almost done. The framing for the new fireplace was started today and should be completed tomorrow along with the rest of the windows. Things are moving along so stay tuned...
 |
|
|
|
|
|
| |