<?xml version="1.0" encoding="UTF-8"?>
<!-- generator="FeedCreator 1.7.3" -->
<rss version="2.0">
	<channel>
		<title>Blog Entries</title>
		<description>Blog Entries</description>
		<link>http://www.phase2homes.com</link>
		<lastBuildDate>Fri, 21 Nov 2008 23:39:44 +0100</lastBuildDate>
        <generator>FeedCreator 1.7.3</generator>
		<item>
			<title>Phase 2 Homes attending JLC Live in Seattle</title>
			<link>http://www.phase2homes.com/blog/Phase-2-Homes-attending-JLC-Live-in-Seattle.html</link>
			<description>Phase 2 Homes will be attending the JLC Live Residential Construction Show in Seattle from November 12 - 15. We are hoping to get some more interesting renovation ideas from the conference which includes sessions on green building, energy efficiency and custom home detail wood working. The conference also has a big exhibit hall with many big industry players where we are hoping to gain some product partnerships for equipment and products.</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Mon, 10 Nov 2008 08:00:00 +0100</pubDate>
		<category>News</category>
		</item>
		<item>
			<title>Thoughts on my trip to Alabama</title>
			<link>http://www.phase2homes.com/blog/Thoughts-on-our-trip-to-Alabama.html</link>
			<description>&lt;p&gt;I just returned from my volunteer work week in Alabama. It was a really great experience both from a work and personal perspective. The house we worked on was really in bad shape, both from neglect and from Katrina &lt;img src=&quot;/images/volunteer08/ala-house.jpg&quot; alt=&quot;House in alabama&quot; width=&quot;171&quot; height=&quot;128&quot; align=&quot;right&quot; /&gt;storm damage. The woman did not have running water even and it wasn't clear how long she had been without it. She got water from a relative next door in buckets and brought  [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Mon, 27 Oct 2008 08:00:00 +0100</pubDate>
		<category>charity work</category>
		</item>
		<item>
			<title>Sale Closed on Carroll Street Project</title>
			<link>http://www.phase2homes.com/blog/Sale-Closed-on-Carroll-Street-Project.html</link>
			<description>&lt;p&gt;We closed our sale today on the Carroll Street, bringing this project to completion. It took us longer than we had anticipated (by about 1 month), but the end result was worth the extra time. We are really proud of the house and feel it really enhances what was already a great neighborhood. We had the fortune to get to celebrate with the new owners at the house this evening with some champagne and wished them well. We added some pictures of the interior to the project page for the Carroll Str [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Wed, 15 Oct 2008 08:00:00 +0100</pubDate>
		<category>house projects</category>
		</item>
		<item>
			<title>Phase 2 Homes Charity Trip to Alabama</title>
			<link>http://www.phase2homes.com/blog/Phase-2-Homes-Charity-Trip-to-Alabama.html</link>
			<description>&lt;p&gt;With the Carroll Street project wrapping up, I decided a good way to take a break after all our hard work would be to give something back to those in need. I was shocked to learn of how many homes in the South are still in need of serious repair 3 years after hurricane Katrina. Towards the end of October, I'm going to be travelling to Alabama (Bayou Le Batre - located in the far southern part of Alabama) to help a 78 year old grandmother who has a blue tarp for a roof. Hurricane Katrina spawn [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Mon, 29 Sep 2008 08:00:00 +0100</pubDate>
		<category>charity work</category>
		</item>
		<item>
			<title>Carroll Street House is Sale Pending</title>
			<link>http://www.phase2homes.com/blog/Carroll-Street-House-is-Sale-Pending.html</link>
			<description>We accepted an offer last night on the Carroll Street house. Our thanks to all that showed interest! This has been a great project house and we are really happy with the results and also with the reactions people have had to the finished product.&amp;nbsp; Keep an eye out for our next project house. It does take time for us to find the right opportunity, so check back every so often.</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Thu, 25 Sep 2008 08:00:00 +0100</pubDate>
		<category>house projects</category>
		</item>
		<item>
			<title>Offer acceptance extended through today at Carroll Street</title>
			<link>http://www.phase2homes.com/blog/Offer-acceptance-extended-through-today-at-Carroll-Street.html</link>
			<description>&lt;p&gt;We've extended the offer acceptance timetable through the end of today due to some time constraints for a couple parties that were interested in submitting offers. If others are still interested but couldn't meet the timeline yesterday, there is still time today. Please call Steve @ 408-480-1914 to let us know what your plans are and when you plan to have your offer ready. &lt;/p&gt;</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Tue, 23 Sep 2008 08:00:00 +0100</pubDate>
		<category>house projects</category>
		</item>
		<item>
			<title>Accepting Offers at the Carroll Street House</title>
			<link>http://www.phase2homes.com/blog/Accepting-Offers-at-the-Carroll-Street-House.html</link>
			<description> Thanks for the great responses at the open house this weekend! We enjoyed having the opportunity to get to meet people and show all the great features of the Carroll Street house. We will be accepting offers to purchase the house on Monday September 22nd. If you are interested in making an offer, offers can be dropped off at the Carroll street house between 5pm and 6pm on Monday. The offer should be a standard real estate purchase offer contract along with documentation of pre-approval for a ho [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Sun, 21 Sep 2008 08:00:00 +0100</pubDate>
		<category>house projects</category>
		</item>
		<item>
			<title>One more open house on Sunday at Carroll Street</title>
			<link>http://www.phase2homes.com/blog/One-more-open-house-on-Sunday-at-Carroll-Street.html</link>
			<description>We had a great day today with our first open house at the Carroll Street house. The feedback from those that were able to come was overwhelming. It was great to see the excited reactions to some of the features we've incorporated into the house and the great response to our design descisions. There were a few people we had heard from that were not able to make it today, so to accomodate those people, we've decided to have one more open house tomorrow, Sunday, September 21st. We'll be having the  [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Sat, 20 Sep 2008 08:00:00 +0100</pubDate>
		<category>house projects</category>
		</item>
		<item>
			<title>Finally ready to show the Carroll Street house</title>
			<link>http://www.phase2homes.com/blog/Finally-ready-to-show-the-Carroll-Street-house.html</link>
			<description>&lt;p&gt;After several delays and frustrations getting our contractors schedules in line, we are pleased to announce that we will finally be ready to show the Carroll Street house this coming Saturday, September 20th. The open house will be from 11am till 4pm. We'll be demonstrating the numerous features of the house as well as serving some light appetizers and drinks. Make sure you come by and take a look at the finished product. &lt;/p&gt;&lt;p&gt;On Friday, we were able to finish several items in the kitchen a [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Mon, 15 Sep 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Still on track for the weekend at Carroll Street</title>
			<link>http://www.phase2homes.com/blog/Still-on-track-for-the-weekend-at-Carroll-Street.html</link>
			<description>&lt;p&gt;We are still on track to show the house this weekend. Lots of details are getting wrapped up this week and the house is really starting to look finished. The front of the house has been landscaped. The driveway was poured on Monday and looks great. The fencing along the driveway is also finished up. The exterior lighting on the back of the house and on the garage was installed. Inside the kitchen cabinet doors and drawers have been installed and we just have some touch up painting to do there [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Thu, 11 Sep 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Information Update at Carroll St</title>
			<link>http://www.phase2homes.com/blog/Information-Update-at-Carroll-St.html</link>
			<description>&lt;p&gt;We've set an asking price of $799,000 for the house at Carroll Street.&amp;nbsp; We are accepting requests for private viewings now for dates staring September 12th. Offers on the house will be accepted on September 16th by 5pm for consideration. An email was sent to the registered users informing them of the current pricing information and also dates for private open house viewing dates. Its not too late to register to get in on the early offering before we consider listing the house on the open [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Sun, 07 Sep 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Progress Update and Schedule News at Carroll Street</title>
			<link>http://www.phase2homes.com/blog/Progress-Update-and-Schedule-News-at-Carroll-Street.html</link>
			<description>&lt;p&gt;We are still having a few issues with sub-contractors schedules as we are wrapping up our project at Carroll Street. We are waiting for our cabinet doors at the moment to finish the kitchen work. Our painters cannot finish until these doors show up so they can finish the painting in the kitchen. &lt;img src=&quot;/images/projects/395carroll/painting-outside.jpg&quot; alt=&quot;house painting&quot; width=&quot;350&quot; height=&quot;223&quot; align=&quot;right&quot; /&gt;The doors should be arriving on Friday and the painting crew will be back to f [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Wed, 03 Sep 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Progress update at Carroll Street</title>
			<link>http://www.phase2homes.com/blog/Progress-update-at-Carroll-Street.html</link>
			<description>&lt;p&gt;Despite our best efforts to finish up our project at Carroll Street this week, we are still looking at one more week to wrap up the last details. The painters that we use were only able to come last weekend and have not been able to give us any time this week due to a schedule conflict with another job. We are hoping to have them show up this coming weekend to get our painting wrapped up. This is not for certain yet, but we are hoping to confirm their time availability tomorrow. &lt;/p&gt;&lt;p&gt;Inside [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Thu, 28 Aug 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Getting Closer at Carroll St </title>
			<link>http://www.phase2homes.com/blog/Getting-Closer-at-Carroll-St-.html</link>
			<description>&lt;p&gt;We've been working extra hours to try to get back on schedule at our house on Carroll Street this week. Lots of progress has been made this past week. As of today (Saturday 6/23) we have our trim work done&amp;nbsp; on all the door casing and the window casing on the inside of the house as well as the base boards throughout the house. Painting has started on the trim work inside the house and will continue through the weekend. The bedrooms and bathrooms trim/casing was painted today along with th [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Sat, 23 Aug 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Floor Color at Carroll St</title>
			<link>http://www.phase2homes.com/blog/Floor-Color-at-Carroll-St.html</link>
			<description>&lt;p&gt;&lt;img src=&quot;/images/projects/395carroll/floorcolor.jpg&quot; alt=&quot;Floor Color&quot; width=&quot;300&quot; height=&quot;198&quot; align=&quot;right&quot; /&gt;We just wanted to give you a quick sample of the finished floor color. Yesterday they were able to get the floor sanding finished and the stain color applied to the floor. It came out even better than we had anticipated! The floor needs some time to dry before work can continue inside. Kitchen cabinet work should continue offsite while the floor is drying.&lt;/p&gt;&lt;p&gt;More to come soon a [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Wed, 13 Aug 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Window Casing, Flooring and Driveway at Carroll St</title>
			<link>http://www.phase2homes.com/blog/Window-Casing-Flooring-and-Driveway-at-Carroll-St.html</link>
			<description>&lt;p&gt;&lt;img src=&quot;/images/projects/395carroll/windowtrim.jpg&quot; alt=&quot;Window Trim&quot; width=&quot;200&quot; height=&quot;300&quot; align=&quot;right&quot; /&gt;The window casing on the inside of the house at Carroll St was finished up and really looks great. We were able to recreate a look similar to that of the original window casing while dressing them up more than the original using our own custom design. Once the painting on the inside is completed they will look fantastic. We are really pleased with how well the work on these came ou [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Tue, 12 Aug 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>New Grass, Tiling, Flooring, and Stucco at Carroll St</title>
			<link>http://www.phase2homes.com/blog/New-Grass-Tiling-Flooring-and-Stucco-at-Carroll-St.html</link>
			<description>&lt;p&gt;The grass was installed over the we&lt;img src=&quot;/images/projects/395carroll/housewgrass.jpg&quot; alt=&quot;&quot; title=&quot;House with grass&quot; width=&quot;250&quot; height=&quot;188&quot; align=&quot;right&quot; /&gt;ekend in both the front and back yards. The new sod and sprinkler system makes a huge difference in the outside appearance of the house. Things look really clean. If you get a chance, take a drive by and see what a difference the new lawn makes. We also installed some lighting outside along the walk to the front porch and beneath th [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Wed, 06 Aug 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Quick Progress update at Carroll St</title>
			<link>http://www.phase2homes.com/blog/Quick-Progress-update-at-Carroll-St.html</link>
			<description>&lt;p&gt;There are lots of things happening simulaneously these days at the Carroll Street house as we push to get things completed. Although the list of things to do is still fairly long, they are mostly detail finishing work at this point.&lt;/p&gt;&lt;p&gt;We started re-laying the original hardwood floor yesterday and expect to finish up the floor re-laying by the end of the week. Once its down, we are going to have it sanded, restained and then sealed. The floor material is still really nice for its age and s [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Wed, 30 Jul 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Let there be light and sound at Carroll Street</title>
			<link>http://www.phase2homes.com/blog/Let-there-be-light-and-sound-at-Carroll-Street-.html</link>
			<description>&lt;p&gt;We have working lights and also working audio at the Carroll Street house.  We had the electrical work finish up the details on the lighting.  We also have working audio in the kitchen. The kitchen speakers were wired in and the A-Bus audio system was connected up allowing us to plugin an MP3 player to one of the wall inputs to play music in the house while we are working. Its very cool and sounds great! Work has also started on finishing the wiring for all the network and video cabling runs  [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Fri, 25 Jul 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
		<item>
			<title>Roofing and Painting at Carroll Street</title>
			<link>http://www.phase2homes.com/blog/Roofing-and-Painting-at-Carroll-Street.html</link>
			<description>&lt;p&gt;&lt;img src=&quot;/images/projects/395carroll/garagewroof.jpg&quot; alt=&quot;Garage roof&quot; width=&quot;300&quot; height=&quot;241&quot; align=&quot;right&quot; /&gt;We now have a real roof and gutters on the new garage at the Carroll Street house. It really makes the garage look more finished. We are scheduled to have the framing inspected on the garage tomorrow and if it passes, we move on to siding, electrical and painting.&lt;/p&gt;&lt;p&gt;Last Friday we had the taping and texturing finished on the sheetrock inside. Today we had painters come and sta [...]</description>
			<author>steve@phase2homes.com</author>
			<pubDate>Mon, 21 Jul 2008 08:00:00 +0100</pubDate>
		<category>progress</category>
 <category>house projects</category>
		</item>
	</channel>
</rss>