Jul 12
2008

Sheetrockin and Garage Roofin Carroll Street

Posted by steve in progresshouse projects

Things are really taking shape now at the house on Carroll Street. All of the sheetrock was completed inside the house, so you can really get a feel for the different room spaces. This next week we'll be having the sheetrock taped and textured in preparation for painting. We'll post so pictures later in the week once the taping and texturing is completed.

The garage roof sheating was completed this week as well. The plan is to finish up the sheating on the front wall so we can have the garage inspected this next week. After that is roofing and siding and the garage will be ready for painting.

Check back soon for more updates.