We've been working extra hours to try to get back on schedule at our house on Carroll Street this week. Lots of progress has been made this past week. As of today (Saturday 6/23) we have our trim work done  on all the door casing and the window casing on the inside of the house as well as the base boards throughout the house. Painting has started on the trim work inside the house and will

Aug 13
2008

Floor Color at Carroll St

Posted by steve in progresshouse projects

Floor ColorWe just wanted to give you a quick sample of the finished floor color. Yesterday they were able to get the floor sanding finished and the stain color applied to the floor. It came out even better than we had anticipated! The floor needs some time to dry before work can continue inside. Kitchen cabinet work should continue offsite while the floor is drying.

More to come soon as things are wrapping

Aug 12
2008

Window Casing, Flooring and Driveway at Carroll St

Posted by steve in progresshouse projects

Window TrimThe window casing on the inside of the house at Carroll St was finished up and really looks great. We were able to recreate a look similar to that of the original window casing while dressing them up more than the original using our own custom design. Once the painting on the inside is completed they will look fantastic. We are really pleased with how well the work on these came out. 

In the

Aug 06
2008

New Grass, Tiling, Flooring, and Stucco at Carroll St

Posted by steve in progresshouse projects

The grass was installed over the weekend in both the front and back yards. The new sod and sprinkler system makes a huge difference in the outside appearance of the house. Things look really clean. If you get a chance, take a drive by and see what a difference the new lawn makes. We also installed some lighting outside along the walk to the front porch and beneath the big tree in the front yard.

Jul 21
2008

Roofing and Painting at Carroll Street

Posted by steve in progresshouse projects

Garage roofWe now have a real roof and gutters on the new garage at the Carroll Street house. It really makes the garage look more finished. We are scheduled to have the framing inspected on the garage tomorrow and if it passes, we move on to siding, electrical and painting.

Last Friday we had the taping and texturing finished on the sheetrock inside. Today we had painters come and starting priming all the

Jul 12
2008

Sheetrockin and Garage Roofin Carroll Street

Posted by steve in progresshouse projects

Things are really taking shape now at the house on Carroll Street. All of the sheetrock was completed inside the house, so you can really get a feel for the different room spaces. This next week we'll be having the sheetrock taped and textured in preparation for painting. We'll post so pictures later in the week once the taping and texturing is completed.

The garage roof sheating was completed

Jul 02
2008

Inspections and Progress at Carroll St

Posted by steve in progresshouse projects

Things are really moving along well over at the Carroll St house. We passed our major inspections yesterday which was a big milestone for the house work. All the major systems inspections (framing, rough plumbing, mechanical, and electrical) passed which allows us to move on to insulating in preparation for sheetrock work. Once we had the green light to insulate, we quickly made good progress on

Jun 25
2008

New Windows and more at 395 Carroll St.

Posted by steve in progresshouse projects

New windows arrived today and some of them were installed on the front of the house. We are really excited by the change in look already. RepFront viewlacing the front door, trim work, painting, lighting and landscaping are still to be done to complete the front, but we've attached a picture so that you can see the style of the windows.

 Inside, the furnace showed up today and was installed. Work continued

Jun 22
2008

Latest Progress on 395 Carroll St

Posted by steve in progresshouse projects

Things are moving steadily along on many things at the house on 395 Carroll St in Sunnyvale. Electrical work has started and progressed quickly. All the outlet and switch boxes have been set, the recessed lighting is in, and wire has been pulled to most of the locations of the house. In a couple days we should be able to turn on the lights at the house!

The skylight for the kitchen was framed in

Jun 18
2008

High Tech Info page

Posted by steve in progresshouse projects

We've added an additional page to Carroll St. project page that describes some of the tech features of the house and the distrubution panel we are using. For you techno-philes out there, its a fun bit of information. We plan to update that information as we add/ update the features of the house.

The 2 main walls of the garage went up yesterday (Tuesday) and the rest should be going up tomorrow.